Project Details

  • Construction Date

    October 2013

Project Description

Foundation waterproofing and historical point up of the 1880’s school. Existing “Butter” joints along the front street side of the structure with standard joints at the other elevations are being repointed in equal lifts with historically correct lime based mortars. The foundations where excavated down to the existing multi wythe masonry placed directly on the earth and then waterproofed with a trowel applied elastomeric waterproofing and dimple board.